in News Departments > Projects & Contracts
print the content item

SMA says it will supply its Medium-Voltage Power Platforms (MV Power Platforms) for the 110 MW Catalina solar project, which is under construction in Kern County, Calif.

The project, developed by EDF Renewable Energy, is scheduled to have its first phase commissioned next month.

The MV Power Platform is SMA's modular utility-scale power conversion solution using Sunny Central technology. The platform consists of two Sunny Central inverters, a transformer, optional DC/AC disconnect cabinets and a control and supply panel for power distribution to local loads and, optionally, field tracker motors, the company says.

More details on the Catalina project are available here.





Hse SandyHook
Latest Top Stories

L.A. Expanding Solar With Finalized FIT Program, New 8.5 MW Array

In an effort to rely less on coal and meet California's renewable energy mandates, LADWP has increased its solar feed-in tariff (FIT) program and added another project to its portfolio.


Global Solar PV Market Poised To 'Rise From The Ashes' Of 2011

A new report from Lux Research says the sector is set for modest growth this year but forecasts a boom by 2018.


How Will EU And Chinese Solar Sectors Fare After This Trade War?

A new report from IHS forecasts what effects anti-dumping duties could have on both parties involved.


City Requires Solar On All New Homes And Businesses

The Sebastopol, Calif., City Council has passed a provision under which future builders will need to install a solar array on their projects and pay for it out of pocket.


EU Commission Agrees On Anti-Dumping Tariffs

Following a long investigation, the European Commission is planning to impose some hefty import tariffs on Chinese photovoltaic products.

Subject
Username:
Comment:

Trojan Battery_id1105
Solar Promotion Gmbh_id1103
Komax_id1125
Solectria
WIP_id1043
Atlas Material Testing_id1123
Quick Mount PV_id1150